Scheduling Plans of Tasks
2021-02-06Unverified0· sign in to hype
Davide Andrea Guastella
Unverified — Be the first to reproduce this paper.
ReproduceAbstract
We present a heuristic algorithm for solving the problem of scheduling plans of tasks. The plans are ordered vectors of tasks, and tasks are basic operations carried out by resources. Plans are tied by temporal, precedence and resource constraints that makes the scheduling problem hard to solve in polynomial time. The proposed heuristic, that has a polynomial worst-case time complexity, searches for a feasible schedule that maximize the number of plans scheduled, along a fixed time window, with respect to temporal, precedence and resource constraints.