SOTAVerified

Cost-benefit Analysis of Two-Stage Conditional Random Fields based English-to-Chinese Machine Transliteration

2012-07-01WS 2012Unverified0· sign in to hype

Chan-Hung Kuo, Shih-Hung Liu, Mike Tian-Jian Jiang, Cheng-Wei Lee, Wen-Lian Hsu

Unverified — Be the first to reproduce this paper.

Reproduce

Tasks

Reproductions